Customization: | Available |
---|---|
Type: | Distribution Metering Box |
Structure: | Protection |
Still deciding? Get samples of US$ 50/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Manufacturing Process | 400x200x600mm IP54 Lockable Steel Utility Wall Cabinet |
Material | Stainless steel, SPCC/SGCC, copper/brass, aluminum for option (according to customer's requirements for special material) |
Surface Treatment | Galvanized (zinc-plated, nickel-plated, chrome-plated, silver-plated), powder coating/oil painting, polishing (mirror polishing, electrolytic polishing), brushing, sand blasting, hot-dip galvanized |
Tolerance | +/-0.01mm or special requirements |
Package | PE Bag, Paper carton box, plywood case/pallet/crate |
Application | Auto parts, electronic products, power supply, industry cabinet, construction etc |
Quality Control | ISO9001 |
Drawing File Format | Solidworks, Pro/E, Auto CAD, PDF |
Features |
|
Inspection | IQC, PQC, FQC, OQA |
Delivery time | 10-20days |
Quality Insurance | One Year |
Notes:
Technical Support
Deshibo is professional at independent development and design. Our engineers are skilled at AUTO CAD, PRO ENGINEER, SOLID WORKS and other 2D & 3D softwares. We are able to design, develop,produce and deliver your products according to your drawings, samples or just an idea. Dural control of standard products and OEM products.
We can supply products with follow test reports :
|
||||
1)Chemical composition report
|
||||
2)Tensile strength report
|
||||
3)Brinell hardness report,Rockwell hardness.
|
||||
4)Metallographic structure report
|
||||
5)Key dimensions checking record report
|
||||
6)Full dimension report
|
||||
7)Third-party test report
|
How long does it take to build an enclosure? We manufacture custom sheet metal electronic enclosures, mounting hardware, and miscellaneous components. We start from your design, and build them in 5-7 days, with no minimum order requirements. Extra lead time may be required for use of non-stocked components or materials, large quantity orders, or silk screening (due to drying time). If time is critical for your job, be sure to discuss it with your account manager, and we can review your design to determine the lead time, and suggest workarounds for any design elements that may result in delays.